Project Description

Signature Project

Since 1998, WHPacific has provided full services, from creation of a new Plan District through master planning and design, to final construction documents and construction services, and continues to provide ongoing site development work. WHPacific was the lead designer of the development’s Primary Infrastructure Development, and Airport Way Overcrossing and North Access Interchange. WHPacific also completed the Airport Way Widening, North Frontage Road Relocation, and East Bike/Pedestrian Pathway Study. These projects have involved all levels of local and State government (19 agencies).

WHPacific has provided the following services, totalling over one million square feet of mixed-use development:

  • Primary Infrastructure (1999) – CM/GC
  • Interchange (1999) – CM/GC
  • ALTA Survey (2004)
  • IKEA Home Furnishings – Parcel A (2005) – CM/GC
  • Retail – Parcel B (2006) – CM/GC
  • Aloft Hotel – Parcel E (2007)
  • Corporate Center I – Parcel H (2007)
  • Corporate Center II – Parcel I (2007-2008)
  • Hyatt Place Hotel – Parcel F (2007-2008)
  • Portland Development Commission – Parcel D NW (2007-2008)
  • Marriott Residence Inn – Parcel G (2007-2008)
  • Federal Bureau of Investigations Campus (2008-2009) – CM/GC

“I would like to take this opportunity to commend and thank your team of professionals at WHPacific for their jobs well done as the principal engineering designers.”
–Steven Schreiber, Aviation Director, Port of Portland

AWARD: 2002 ACEC Oregon – Engineering Excellence Honor Award