Project Description

WHPacific provided engineering and full design services for this 46-acre community sports park and ¾-mile-long “collector” access loop roadway project located on Oregon State Penitentiary lands in East Salem Oregon. The project design included grading, final layout, wetland mitigation site, irrigation with a Rain Bird MaxiCom system, sub-drainage design and utilities for the natural and synthetic turf athletic fields, a roller hockey field, parking, restrooms facilities, picnic areas, playground shelter and other park amenities. Surface drainage is directed to water quality bioswales which ultimately feed to central detention ponds that have been extensively enhanced with native and riparian plantings.