Project Description

WHPacific fast-tracked 9 bridge designs, bringing them in under schedule and with an estimated $1.6M savings. This bridge bundle included the first bridge in Oregon to be constructed using local agency OTIA III funds. Polk County’s goal was to have the bridges designed and constructed quickly to avoid cost increases.

  • Nine bridge designs
  • Fast track schedule
  • $1.6 million in savings

AWARD:  2007 ACEC-OR Engineering Excellence Honor Award