Gold Beach Airport Runway Rehabilitation Project

, ,

WHPacific provided design and construction management services for the reconstruction of Runway 16-34; 3,200’ x 75’. The project included new MIRL runway lighting and electrical systems; adding REILs to both runway ends, lighted wind cones, airport beacon, under-drain systems, airfield directional signs and installation of edge reflectors on the parallel taxiway. The design process developed [...]

Bend Municipal Airport Taxiway A Relocation

, ,

WHPacific provided planning, design, environmental permitting, bidding, and construction management services to relocate this airport’s existing west side parallel taxiway (5,200 feet x 35 feet) to Runway 16/34. Work included reconstruction of six connector taxiways and aircraft run-up aprons at the two threshold connector taxiways. The project upgraded the Taxiway Safety Areas and increased the [...]

Aurora State Airport Master Plan Update

, ,

WHPacific undertook this Master Plan Update for the fastest growing GA airport currently serving the Portland (Oregon) metro area, which is mostly accessed through-the-fence. Work on the project included a detailed runway length analysis and justification element, including a recommendation to extend the runway from 5,000 to 6,000 feet – a major runway extension. Our [...]

Oregon Department of Aviation Pavement Management Program

, ,

Signature Project WHPacific developed the Pavement Maintenance Program (PMP) in conjunction with the Oregon Department of Aviation in 1999. Since then, WHPacific has provided engineering services from concept through construction for $1 million in pavement maintenance performed at General Aviation airports throughout the state, on a rotating basis. It is targeted at smaller airports that [...]

Boise Airport, Baggage Conveyor Area, Static LiDAR Scan and 3D Model

, ,

WHPacific was requested by the BOI Airport to complete a survey of the Baggage Conveyor area to document the “as-constructed” conditions of the site utilizing LiDAR scanning techniques with an end result being an accurate 3D model CADD drawing to aid in the design and retrofit of a conveyor and baggage scanner update project that [...]

Lake County Airport Runway Rehabilitation

, ,

This project includes primarily the rehabilitation of Runway 17-35. The runway is 5,318 feet long by 100 feet wide and has exceeded its useful life. Improvements include constructing new run-up aprons at each end and transition taxiway paving as well as visual NAVAID, safety area, and grading improvements. The USFS uses the airport frequently during [...]

Arlington Municipal Airport Wildlife Hazard Assessment

, , ,

WHPacific has completed a Wildlife Hazard Assessment (WHA) and Wildlife Hazard Management Plan (WHMP) for the Arlington Municipal Airport. The WHA has been accepted by the FAA, and the WHMP is currently under review. The airport is comprised of approximately 1,200 acres of land and the primary wildlife activities include birds, small mammals, and some [...]

Portland International Airport Taxiway 8

, , , ,

WHPacific assisted the Port of Portland in developing alternatives for rehabilitating and relocating portions of Taxiway B. The information delivered included field investigation data and engineering reports on subsurface soil conditions, alternative asphalt, and concrete pavement sections developed for the projected aircraft traffic loads, life cycle cost analysis of the different pavement sections, and constructability [...]

Grant County Regional Airport

, , , , , ,

Grant County had a concept never undertaken by a regional airport; to consolidate its 50 year old airport terminal building with the U.S. Forest Service (USFS). WHPacific worked closely with the client and project team to update facilities and create a new home for the fire base and regional rappeller training academy. When completed, the [...]

Ted Stevens Anchorage International Airport

, , , ,

Signature Project WHPacific updated the airport master plan for Ted Stevens Anchorage International Airport. The primary tasks include completing a feasibility study for the new north-south runway and preparing development options for East Airpark, Northeast Airpark, Kulis Air National Guard Base, West Airpark, South Airpark, and the Passenger Terminal area. WHPacific provided provide survey and [...]